
Inspecting substrates
Assessing the condition and agreeing on preparation for chosen finishes.


Assessing the condition and agreeing on preparation for chosen finishes.

Laying the chosen coverings after checking the base, floor levels and transitions.

Planning tile size, layout and edge details around the room and the agreed work.

Timing skim coating, sanding and painting around the other work in the room.

Completing edges, transitions and other agreed finishing details.

Planning the work sequence and final inspection with the relevant trades.




For finishing work in Pazin, show us each room and the surfaces we'll be working with. Let us know which other trades are still on site; floor heights and door transitions are especially important when replacing coverings.
More about this service ↗
Start with the property location, the work you have in mind and approximate measurements. We'll take it from there.

Send photos of the existing space and the parts you want to change. A floor plan helps if you have one.

We inspect the property, including existing surfaces, access and the details that may affect the job.

Your quote sets out the work, materials and the basis for the quantities.

Before starting, we settle the work, timing, materials and how we'll stay in touch.

We work through the agreed stages and discuss any changes before carrying them out.

At the end, we check the completed work and finishing details together.
You can enquire about the remaining scope. We assess the existing work and any preparation needed to continue before quoting.
Yes. Tell us which rooms and items to include and send photos of the existing space.
We agree on supply before work begins. The type, quantities and delivery date must fit the work plan.
The quote lists preparation and finishing after inspection. Any work identified later requires a separate agreement.
Tell us a little about the property and what you want to do. We'll talk through the work and arrange a visit if needed.
info@build-grupa.hr